This was the last trip to the lakehouse before school starts and we had a good trip. We had many things to do and folks to see and was unable to get everything done. We got to the lake anbout 9:30 on Thursday night and I had toget a flashlight to check out the rock and other things that had changed in the addition. It was hard to tell so I was up at daylight to check it out. The rock is looking good. It seems to be moving pretty fast. They had planned to work on Saturday and Sunday but I guess they decided with the rain they would just wait. I was sure hoping to see a column completed with rock before I left. I guess Susan will have to send my pictures. They have completed the hanging of sheet rock in my bedroom and have almost comleted the master bathroom. The other air condition unit is in stalled and from what I can tell is working fine. The contractor told us he had to run it for 4 hours and it dropped the temperature to 75 and all worked fine. The shower is installed in the master bathroom. I have posted some pictures that I took with my phone camera because I forgot my camera, lol. Hard to believe???? I have gotten a new phone, I had to have one like Tracy's and it took me all weekend to find the camera on it , so I don;t have many lake photo's. I do have one of Brooke having a jetski driving lesson from big brother Kyle.







We got a chance to play on the lake Friday with Marcia and Greg and their grandkids... was nice yto spend some time with all of them... we seem to be going in different directions this summer and have not had laketime together.
Saturday I woke up to rain and had to make myself go look for bathroom tile. I did not find what I wanted so was a wasted morning other than buying up fresh veggies. The kids shelled peas and I cooked peas, cornbread and fried okra while waiting on the weather to clear offf for a lake trip. We had gotten the white jetski back and checked it out and ummm it failed the test so we took it out and Dad will take it back to the shop for us on Monday. John was nice to let us try it he had installed the replacement motor but not put it on the comper to program it and had hopes it would work with the old settings ... Sure hope the computer programming is the fix. Chloe joined us on Saturday night after her swim meet.....I will just say she did great and leave the major bragging rights to her Mom's blog.
It will be 2 weeks before we go back to the lake and there will be a big change then if all goes well. We have moved everthing out of the 2 existing bedrooms and they will be blocking them off from the den and opening up the entrance from the new hallway and then ripping out the paneling and putting up sheetrock so it can all be floated out at the same time....I think that will all be completed when we go back but will probably still need to paint and install floors. I am sure hoping that by labor day the inside of the bedroom end is completed. So thats about it for this weekend. August is almost here and school too geesh where does time go?
1 comment:
I want some shelled peas and fried okra! lol the addition is looking GREAT
Post a Comment